USA:+1-914-289-0202
UK:+44-1672-519202
Eur:+33-4-99-64-24-14

Inspection and Test Services:

Active Components (Basic Test Plan)

  • External Visual Inspection
  • Dimensional Check
  • Blacktopping Test
  • Marking Permanency Test
  • Radiographic Inspection
  • De-Cap (2 components - Ceramic Parts Only)
  • Internal Visual Inspection (2 components)
  • Process Documentation
  • Lot Based Sampling per MIL-1916 unless Otherwise Mentioned
Lead Time: 2-3 Days
Cost: $375.00

Transistors and Diodes (Basic Test Plan)

  • External Visual Inspection
  • Dimensional Check
  • Radiographic Inspection
  • Marking Permanency Test
  • Functional Test of Basic Parameters at Ambient Temperature (Varies by product type)
  • Process Documentation
  • Lot Based Sampling per MIL-1916 unless Otherwise Mentioned
Lead Time: 7 Days
Cost: Contact your sales rep

Active Components (Expanded Test Plan)

  • De-Cap (2 components - plastic)
  • DC Curve Tracing (under 75 pins)
  • Lot Based Sampling per MIL-1916 unless Otherwise Mentioned
Lead Time: 7 Days
Cost: Contact your sales rep

  • Comments: Additional Charges may apply for hardware and/or NRE for complicated packages or non-standard packages with more than 75 pins.
  • Resistors (Surface Mount - Basic Test Plan)

    • External Visual Inspection
    • Dimensional Check
    • Radiographic Inspection
    • Marking Permanency Test (if marked)
    • DC Resistance per MIL-PRF-55342
    • XRF Termination Finish
    • TCR per MIL-PRF-55342 (samples destroyed)
    • Lot Based Sampling of 100 parts
    Lead Time: 7 Days
    Cost: Contact your sales rep

    Active Components (Functional Testing)

    • Subject to quote.
    • Subject to NRE and Hardware Development
    Lead Time: Greater than 4 Weeks
    Cost: Contact your sales rep

    Capacitors (Basic Test Plan)

    • External Visual Inspection
    • Dimensional Check
    • Radiographic Inspection (if appropriate)
    • Marking Permanency Test (if marked)
    • Functional Test of Basic Parameters at Ambient Temp (varies by product type and may include: Capacitance, ESR, Leakage, Voltage Rating (Descructive), Insulation Rating (Destructive), Dielectric Strength (Destructive).
    • Lot Based Sampling of 100 parts
    Lead Time: 7 Days
    Cost: Contact your sales rep


    Copyright © 1998-2012 Oxygen Electronics, LLC All rights reserved.
    Privacy Policy